Introduction
The average industrial plant generates terabytes of data annually. Yet operational decisions are still made based on monthly reports and spreadsheets.
The Real Problem: Decision Latency
Decision latency — the time between an event and a human acting on it — is the metric that matters. In most plants: cost issues take 30-60 days to surface, maintenance issues 7-14 days.
Building an Intelligence Stack
- Layer 1: Data Integration — connect SAP, Primavera P6, plant historians, CMMS
- Layer 2: Decision Dashboards — each dashboard answers one question for one role
- Layer 3: Predictive Analytics — forecast failures 2-4 weeks before they occur
Design principle: every number on the dashboard should trigger a specific action if it crosses a threshold. If a metric does not drive action, remove it.
Practical Example
At NLMK Europe Belgium, Power BI dashboards connected to SAP reduced uncontrolled commitments by 15% and report compilation time by 70%.
Conclusion
Industrial digitalization is not about technology — it is about decision transformation.